CiCi

Corridor Intelligence

Connecting to live data sources...

Command Infrastructure Corridor Intelligence

Storage

Hardisty Storage KPI

Placeholder data

Crude inventory levels, build/draw velocity, and WCS spread correlation

Design prototype

Early Warning Active: Storage utilization crossed 80% - Alert Level 1. Historical patterns indicate WCS-WTI spreads may widen within 10-21 days.

Days of Supply
18.2days

82.0% utilization

24.6 MMbblCap: 30.0 MMbbl
Net Volumetric Trend
+35 kbpd

14-day rolling build rate

Flow Velocity - Real-Time
Inflow1,380 kbpd
Outflow1,345 kbpd

Net build: +35 kbpd (14-day avg)

Threshold Status
80% levelCrossed 3 days ago
90% storage levelEst. 69 days
WCS spread now-$21.50/bbl
Inventory vs. WCS-WTI Differential

Purple = storage volume (left axis) - Slate = WCS-WTI spread (right axis)

90% cap
Storage Volume (LHS)WCS-WTI Spread (RHS)
Days-to-Full Projection
Time to 100% capacity154 days - Est. Aug 20, 2026
Available capacity remaining5.4 MMbbl
Risk scoreElevated

7-day throughput trend

System Event Log
Prototype feed
WARNING

Storage build rate spike. +45 kbpd net over last 4h (vs +35 kbpd 14-day rolling avg). SEG-3A pressure drop contributing.

INFO

Enbridge Mainline apportionment confirmed at 15% for upcoming month.

CRITICAL

WCS-WTI spread widened past -$20 (-$21.50). Pattern consistent with prior apportionment episodes.

WARNING

Trans Mountain nominations exceeded 90% apportionment trigger for second consecutive day.